Master's(MSE) Project
SnIPS Implementation and GUI

Phase 1
   Time Log
   Vision Document 1.0
   Project Plan 1.0
   SQAP 1.0
   Presentation 1 (ppt file)
   *Phase 1 Presentation Date:
     - Dec. 3rd(Thursday), 2009, 10:30am ~ 11:30am
Phase 2
   Time Log
   Vision Document 2.0
   Project Plan 2.0
   Architecture Design 1.0
   Test Plan 1.0
   Formal Specification in USE/OCL
   Technical Inspection Checklist
   Presentation 2 (ppt file)
   *Phase 2 Presentation Date:
     - Mar. 30th(Tuesday), 2010, 2:00pm ~ 3:00pm Phase 3
   Time Log
   Architecture Design 2.0 with Compoenent Design
   Assessment Evaluation
   Project Evaluation
   Inspection Letter from Luis Carranco
   Inspection Letter from Daniel Greene
   User Manual
   Reference
   Presentation 3 (ppt file)
   *Phase 3 Presentation Date:
     - May 5th(Wednesday), 2010, 2:30pm ~ 3:30pm